Date/Time
Date(s) - July 16, 2019
8:00 am - 4:00 pm
Location
EDC of Elkhart County
Participants learn the fundamentals of set-up reduction in applying quick-change thinking to any type of setup or industry. This training focuses on attaining quick changeover through the systematic elimination of the internal components of a setup, while streamlining the final procedure. Reductions in set-up time mean you can produce in smaller lots, thereby making a greater variety of products in the same amount of time.
Meet the Instructor:
Ed Hlava – Senior Productivity Specialist
Responsibilities:
Ed is an Advanced Manufacturing Specialist with the Purdue University Technical Assistance Program, Manufacturing Extension Partnership Center.
Background:
Positions included: Quality Assurance Manager, Customer Service Manager, Production Manager, Regional Operations Manager, and Plant Manager. Ed worked primarily in the Printing Industry for the Burroughs Corporation and Standard Register before joining Purdue University’s Technical Assistance Program. Prior responsibilities included continuous improvement development, profit and loss management, and operational growth. As a Lean/Six Sigma Champion, Black Belt mentor, and certified Green Belt, Ed has successfully applied these methodologies to prioritize, manage, develop and sustain process efficiencies.
Skills & Expertise:
Ed has over 25 years manufacturing management experience in both operations and a manufacturing environment. He has an AS degree in Printing Technology and BS degree in Printing Management from West Virginia University, Institute of Technology.
- Lean Bronze Certification from the Society of Manufacturing Engineers (SME)
- Association for Manufacturing Excellence (AME)
- The Shingo Prize for Excellence
- American Society for Quality (ASQ)
Bookings
Registration is closed for this event.