Date/Time
Date(s) - May 14, 2024
8:00 am - 4:00 pm
Location
Economic Development Corporation of Elkhart County
Quick changeover is a lean manufacturing technique that can improve manufacturing efficiency by significantly decreasing changeover time. Quicker changeovers can reduce manufacturing costs and increase flexibility.
In this workshop, you’ll learn the fundamentals of set-up reduction in applying quick-change thinking to any type of setup or industry. This training focuses on attaining quick changeover through the systematic elimination of the internal components of a setup while streamlining the final procedure.
Objectives:
- Demonstrate a thorough understanding of quick changeover and setup reduction concepts and principles.
- Know how each step of the changeover improvement process contributes to setup reduction or elimination.
- Document all the tasks or elements that make up an existing changeover process.
- Apply the Single Minute Exchange of Die (SMED) system to analyze changeover tasks and identify improvements.
- Implement quick changeover improvements and monitor results.
- Develop a plan to standardize improvements.
Intended audience: Manufacturing personnel, including technicians, engineers, and managers.
Workshop length: 8 hours
Cost: $295 per person until April 30, then $315 per person
Location: Economic Development Corporation of Elkhart County, 300 NIBCO Parkway, Suite 201, Elkhart, IN
Register By: May 8
To Register: https://mep.purdue.edu/workshops-and-events/workshop-catalog-detail/?id=undefined&eventid=a3QRd000000Wad3MAC